| Park Master Plan |
The Symmes Township Board of Trustees recognizes the need for future planning in an effort to be good stewards of the public's money. With that in mind the Board instructed Township staff to put together a DRAFT copy of a Park Master Plan. Good planning enhances the probability of maintaining a park system we all can be proud of.
Below is the DRAFT copy of the plan the staff put together for review by the Board of Trustees. If you have any suggestions, please send an email to the Township Administrator at administrator@symmestownship.org. |
DRAFT
Master Plan for Symmes Township Parks
Priority
1=Needs to be done
2=High priority
3=Should be considered
4=Not that important |
Hopewell Meadows Park |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Make rubber surface repairs (holes under swings) |
Now |
$2,500.00 |
1 |
Build dog run area with 1500' fence and 4 benches |
$5,000.00 |
1 |
| Add rubber surface protective coating (cracks throughout) |
3 |
$3,000.00 |
2 |
Add 5 more picnic tables |
$4,500.00 |
3 |
| Seal parking lot & walking trail |
2 |
$6,500.00 |
1 |
Add 2 more benches around trail |
$1,000.00 |
3 |
| Seal tennis & basketball courts |
1 |
$4,500.00 |
2 |
Add 3 more fountains at far end of trail, by basketball court & in dog run (in house) |
$8,000.00 |
3 |
| Paint restrooms |
3 |
$1,000.00 |
3 |
After the rubber surface coating is completed, need to figure $2,000.00 every 2 to 4 years to recoat |
$30,000.00 |
2 |
| |
|
|
|
Add small gazebo type shelter at playground area with picnic tables |
$10,000.00 |
4 |
| |
|
|
|
Add storm water drain to drain water runoff @ baseball field (in house) |
$1,000.00 |
3 |
Blong Park |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Reseal parking lot |
3 |
$2,000.00 |
2 |
|
|
|
Meade Property |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Paint & repair soffits |
Now |
$30,000.00 |
1 |
|
|
|
| Repair window & shutters |
Now |
|
1 |
|
|
|
| Repair driveway |
Now |
|
1 |
|
|
|
| Reseal parking lot |
3 |
$2,000.00 |
2 |
|
|
|
Seven Gables Park |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Seal tennis & basketball courts |
2 |
$6,500.00 |
3 |
Add gazebo type shelter with tables at tennis courts |
$10,000.00 |
4 |
| Seal parking lot & walking trail |
4 |
$4,000.00 |
3 |
Add gazebo type shelter with tables at playground |
$10,000.00 |
4 |
| New sign needed |
1 |
$2,000.00 |
1 |
Run water to the shelter with a fountain (in house) |
$4,000.00 |
3 |
| Paint restroom |
2 |
$1,000.00 |
2 |
Add a small dog run area |
$3,000.00 |
3 |
| Stain shelter & repair trim boards |
2 |
$2,000.00 |
2 |
|
|
|
Stonebridge Park |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Reseal parking lot |
3 |
$3,500.00 |
2 |
Add gazebo type shelter with tables at playground |
$10,000.00 |
3 |
| New sign needed |
2 |
$2,000.00 |
2 |
|
|
|
Camp Dennison Nature Trail |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Reseal parking lot |
2 |
$1,000.00 |
2 |
Add picnic tables & small shelter |
$20,000.00 |
4 |
| |
|
|
|
Add on to parking lot for cleanups |
$15,000.00 |
3 |
Symmes Park |
Maintenance |
Years |
Estimated Cost |
Priority |
New Projects |
Estimated Cost |
Priority |
| Repair & reseal parking lot |
1 |
$5,000.00 |
2 |
Reconstruct the lake |
$30,000.00 |
4 |
| Reseal basketball court |
1 |
$1,500.00 |
3 |
Run water to all 3 shelters (in house) |
$4,500.00 |
2 |
| Replace the Deer Run playground |
1 |
$25,000.00 |
3 |
Replace roofs & put gutters on all 3 shelters |
$15,000.00 |
2 |
| Replace the Shady Ridge playground |
2 to 3 |
$30,000.00 |
3 |
Add water line to dog run area with fountain (in house) |
$2,500.00 |
4 |
| Replace the Leming playground |
2 to 3 |
$40,000.00 |
3 |
Divide basketball courts in half (in house) |
$ 3,000.00 |
2 |
| Widen & repair blacktop trails (in house) |
1 |
$10,000.00 |
2 |
Run water to the Meadow |
$10,000.00 |
2 |
| Repair Amphitheater floor (concrete) |
2 |
$15,000.00 |
1 |
|
|
|
| Make repairs to bird blind |
1 |
$1,000.00 |
2 |
|
|
|
| Replace culverts in creek with 2-48" pipe & headwalls |
1 |
$16,000.00 |
1 |
|
|
|
| Repaint restrooms |
2 |
$1,500.00 |
3 |
|
|
|
| Maintain bridges over streams with moving water |
3 |
$10,000.00 |
1 |
|
|
|
|
| |
|